Special Offer S140131 – Connections to Lamda Hellix PoP during the pilot operation

Archive: Special offer S140131 (21.02.2014 - 31.12.2016)
Release date: 30.01.2014

During the pilot operation of the Lamda Hellix GR-IX POP (30.01.2014 to 31.07.2014), no installation or monthly fees will be applied for any connections there.

In addition, for existing members who will relocate a connection from the EIE POP to the LH POP during the pilot:

  • The new connection will be, as mentioned above, free of charge until the end of the pilot.
  • There fees for the old connection (at EIE) will be waived from the date of the new connection and until the relocation is completed (as long as this is completed up up to two months after the end of the pilot).